久久精品亚洲欧美va_人妻精品久久久久中文字幕69 _一本色道无码道DVD在线观看_欧美日韩高清一区二区三区视频_久久亚洲AV成人无码_国产在热线精品视频99国产一二

Enterprise News
Warm congratulations on the official opening of the outpatient and inpatient complex building of Wuzhou Workers' Hospital in Guangxi
Release time: 2023-12-20
Recently, Guangxi Wuzhou Workers' Hospital, which was contracted by Shenzhen Weida Medical System Engineering Co., Ltd., celebrated the 120th anniversary of the establishment. On the same day, the outpatient and inpatient complex building of the hospital was officially put into operation. Li Jihai, Ding Zuopeng, project manager Wei Yu and other leaders were invited to attend the opening ceremony.


Enable the ceremony


Group photo with President Ou Jinxi (3 from left and left)


Take a group photo with Director Liu Zhenjian (third from left)
 
 

Guangxi Wuzhou Workers' Hospital


It is reported that the use of the hospital outpatient and inpatient complex building planning a total construction area of about 140,000 square meters, a total of 28 floors. It is expected that after the outpatient and inpatient complex building is put into use, the general hospital of the hospital will open more than 1200 beds and add more than 900 new parking Spaces. The spacious and bright outpatient building, together with the newly introduced equipment and continuously improving medical technology, will significantly improve the level of medical services and patients' medical environment.
 

The negative three medical radiotherapy area, negative EICU, negative emergency center, negative layer, CT room, one layer of intravenous fluid center, second layer imaging center, respiratory medicine, DSA, three, inspection center, three gynecology, obstetric outpatient operating room, four digestive endoscopy, four daytime operating room, four pathology, four stomatology, five surgery center, five surgery department changing area, five ophthalmology clinic, six ICU, six blood transfusion, six purification equipment room, seven hemodialysis, eight obstetrics, nine NICU, ten PICU, 11 C arm room, 13 floor burn disease Room, 16-floor ophthalmic operating room and 18-floor CCU total about 23,000 square meters, A total of 26 departments, The construction is completed by Vida Medical.
 





Guangxi China workers hospital project, under the group leadership attaches great importance to and carefully as a whole, unified command, strengthen the optimal allocation of resources, give full play to the weida medical optimization and the comprehensive advantages of the design of construction management, finally ensure that the project of high quality, high standard of delivery enabled, also for the development of weida medical wrote a brilliant!
 

Scan QR code
Follow the official WeChat platform
Learn more

  • Contact number:027-87827660
  • Company address:Building 5, Huazhong Xiaogui Mountain Financial Culture Park, No. 203, Zisha Road, Wuchang District, Wuhan City, Hubei Province
Copyright 2015-2019 China Security Co., Ltd    | 鄂ICP備2022010799-1號滬公網(wǎng)安備31010702002659號